Modular gas turbine enclosures shipped to five different sites.
MHPS America GAC & JAC Gas Turbines – Modular Structure
In 2018-2022, we have performed Structural Enclosure Design analysis and prepared periodic reports regarding the design, manufacture, painting, testing, inspection, packing and shipping of the GT enclosure, in collaboration with ÇİMTAŞ.
The job also had the following steps to be taken into account, when performing the required analysis.
- After build of modules, full stack and assembly. Prior to shipment, disassembly
- Full installation of pipe, platforms, handrails, toe plates, ladders, structural members, doors, hatches, trolley beams, steps for each module
- Temporary bolt up of all module interconnect pipes at flanges
- Validation of flange location at intercept of module and ship loose pipe for Gas Turbine (template, laser)
- Setting of all pipe hangers, spring cans, supports to designed elevation
- Temporary shipping supports for pipe systems
Get in touch with our team
Other projects in this market
View all projects
Structural analysis and quantity take-off calculations of the pipe rack structures within a petrochemical facility proposal.
New upper structure design, lower structure retrofit, temporary supports and transportation analyses for the Cold Box (Structure F).
Design and shop drawings for temporary supports and foundations, plus a bespoke 'pulling head' for the line running into the sea.