Pipe rack structures for a petrochemical proposal.
West Qurna 2 Pre-Assembly Facilities
We provided proposal-stage engineering for the oil field pre-assembly facilities in the West Qurna 2 region of southeastern Iraq.
MBY's task was to conduct the structural analysis of the pipe rack structures in the petrochemical facility proposal, document any deviations from the existing designs through reports, and prepare the quantity take-off calculations for the proposed structures.
The work was completed for ÇİMTAŞ Gemlik, providing accurate tonnage and cost projections that fed directly into tender decisions.
Get in touch with our team
Other projects in this market
View all projects
Structural enclosure design analysis and shipping engineering for GT enclosures, in collaboration with ÇİMTAŞ.
New upper structure design, lower structure retrofit, temporary supports and transportation analyses for the Cold Box (Structure F).
Design and shop drawings for temporary supports and foundations, plus a bespoke 'pulling head' for the line running into the sea.