ASCE 41-17 Tier 1 screening across a nationwide retail portfolio.
Decathlon Stores — Seismic Risk Assessment
MBY provided seismic engineering consultancy for a nationwide retail portfolio, performing ASCE 41-17 Tier 1 seismic evaluations and visual structural assessments of existing facilities. The scope included structural and non-structural seismic screening, on-site inspections, review of available documentation, rapid engineering checks, and risk-based evaluation of building systems in accordance with internationally recognized seismic assessment procedures.
The project established a standardized engineering methodology to evaluate multiple facilities using a consistent framework, enabling comparable seismic assessments across different locations. Our services included the preparation of engineering reports, structural screening checklists, documentation of observations, and the identification of engineering priorities to support future asset management and seismic resilience planning, while ensuring full coordination with facility operators throughout the assessment process.
Get in touch with our team
Other projects in this market
View all projects
Reinforced concrete structural design of car park blocks B2, B3 and B4 — two structures of 5 and 7 storeys plus their ramp building.
Static calculations for the steel and aluminium façade system of the White City development.
Structural design of interior elements — bar counters, staircase, wooden lattice and screening room — in a $40 million club renovation.
What we have written on this
See all
What Is FEMA P-154 Rapid Visual Screening?
The scoring logic behind FEMA P-154, where it helps in leasing and acquisition decisions, and the limits of what a visual method can tell you.

Strengthening Methods: Jacketing, FRP, Steel Frames and Added Shear Walls
What each strengthening method contributes, how the method is selected, and why supervision of the work on site decides the outcome.

How Is Concrete Strength Determined on Site?
Why cores are the primary method, what rebound hammer and ultrasonic readings can and cannot tell you, and why the two are planned together.