Shop drawings for 9,000 tonnes of steel, delivered on schedule.

Baghdad Besmaya Combined-Cycle Power Plant

Location
Irak / Bağdat
Market
Infrastructure
Services used
Construction Engineer / Structural Assessment & Seismic Safety / Structural Engineering
Scope of services
Construction Documentation
Baghdad Besmaya Combined-Cycle Power Plant

The project was undertaken by the ENKA - BECHTEL Joint Venture, on EPC turnkey basis.

The facilities in the project, owned by Mass Group Holding Ltd., consisted of the Electrical Building, Turbine Building and other subsidiaries.

The total steel weight in the project was about 9.000 tonnes (20160 kip).

Commissioned by the EPC main contractor ENKA of Istanbul, MBY successfully completed the shop drawings for the Baghdad BESMAYA Combined Cycle Power Plant within schedule, compliant with the quality standards of ENKA.