Shop drawings for 9,000 tonnes of steel, delivered on schedule.
Baghdad Besmaya Combined-Cycle Power Plant
The project was undertaken by the ENKA - BECHTEL Joint Venture, on EPC turnkey basis.
The facilities in the project, owned by Mass Group Holding Ltd., consisted of the Electrical Building, Turbine Building and other subsidiaries.
The total steel weight in the project was about 9.000 tonnes (20160 kip).
Commissioned by the EPC main contractor ENKA of Istanbul, MBY successfully completed the shop drawings for the Baghdad BESMAYA Combined Cycle Power Plant within schedule, compliant with the quality standards of ENKA.
Get in touch with our team
Other projects in this market
View all projects
Engineering for the suspended subsea pipeline's first-of-its-kind anchorage structures, including deep-water installation scenarios.
Structural design of steel support frames and lifting and transportation engineering for the external piping works of the Newman Power Plant.
Concept design approaches and modular construction evaluation for the cargo pilot program's infrastructure needs.